Friday, September 28, 2012

Day of Caring 2012

Landscaping at the Train Shed.
Every year in September, United Way of King County organizes Day of Caring where thousands of volunteers all take the day off from work and volunteer in their community. United Way asks non-profit organizations to sponsor projects and then group leaders - mostly from companies - sign up for projects and organize volunteers to work on those projects. This year, on September 21, 2012, the Northwest Railway Museum participated in Day of Caring by sponsoring two groups from Microsoft who worked on several projects. A third group will come in October from the Marriot Hotel, who were unable to come on the 21st but still wanted to participate.

The first project was for a group to go to Snoqualmie Falls to help with ivy mitigation and brush control.  Every year the English ivy that was planted at the site of the Snoqualmie Falls Hotel in the late 1800s grows robustly around the trees and vegetation, choking the life out of the native landscape. The Museum annually works to mitigate the ivy’s impact by cutting it back.  Day of Caring volunteers helped greatly with this project and also trimmed back some of the brush including non-native holly that has been starting to impede the visitor experience at the falls.
Rehabilitating benches for coach 218.

The second project was to beautify the Northwest Railway Museum Train Shed Exhibit Building by planting over 200 huckleberries, dogwoods, ferns, snowberries, cedar trees, sallal and Oregon grape. Volunteers were able to complete the landscaping around the Train Shed so that it is now returned to its native beauty.

Landscaping at the Train Shed.
Volunteers also worked at the Snoqualmie Depot: they washed windows, power washed the walkways, cleaned in the bookstore and swept. Before starting the Depot cleaning, the same volunteers spent the morning cleaning Coach 1590 for the arrival of the newly re-upholstered seats.  By the end of the day, Coach 1590 was shiny and had new cushions!

Staining a fence at the Train Shed.
Day of Caring volunteers worked on Collections Care rehabilitation projects too.  A group of five people worked throughout the day striping shellac in the Chapel Car in anticipation of additional installation of interior cladding in the next week.  They also helped disassemble benches that are being restored and installed in Coach 218 in the next year.

Stripping shellac in the chapel car.
All told there were over 50 volunteers from Microsoft, plus, to help coordinate the event, five volunteers from the Museum helped run the speeder (to move volunteers between work sites) and train set and another who helped supervise the projects.

The Northwest Railway Museum thanks all of the volunteers who helped out from Microsoft and from the Northwest Railway Museum. It was a very successful day! If you have a group that would like to come and volunteer for a day, please feel free to contact our Volunteer Coordinator Cristy Lake at any time - there is more information on the web site. Volunteering as a group for the day can be a fun way to serve the community and have an enjoyable time with friends.
Rehabilitating benches for coach 218.

Wednesday, September 12, 2012

Platform to preach

Chapel car 5 Messenger of Peace with
its distinctive open vestibules or plat-
forms.
A distinguishing feature of many 19thCentury railroad cars is an open platform or vestibule on one or both ends.  For chapel car 5 Messenger of Peace, this platform was the ingress and egress to the car.  So the preacher, his wife, and all the parishioners used the open end platform to enter and leave the car.  Clearly, restoration of this missing feature was vital for a successful project, and was fully supported by the major funders including Save Americas Treasures, the National Trust for Historic Preservation's Partners in Preservation (Seattle) and the  Washington State Heritage Capital Projects Fund administered by the Washington State Historical Society. And it was one of the most challenging aspects of the project because most of the work had to be performed in a specific sequence between March 2011 and April 2012 to avoid conflict with other work divisions such as carbody rehabilitation, floor repairs, and even the Terne roof installation. 
"Badly deteriorated"was the entry made
in the intial survey.  Little remained
in place from the original platform.
 
Vestibules in general are highly susceptible to deterioration.  Open platforms are even worse off.  Every rain storm, passing insect, or even passing thief has open access.  For instance, when the car was just a few years old, the pastor woke up one morning to learn that his milk can had been stolen from the end platform.  Apparently that Sunday’s sermon reminded parishioners that “thou shall not steal!”
The only surviving section of the
original platform end beam (top) is com-
pared with the new end beam (bottom).
The Messenger of Peace had very little to offer about the platform to researchers and rehabilitation specialists as they put their work plan together.  Fortunately, a portion of the original end beam had been recovered from the seaside where the car was used as a cabin; it confirmed the basic dimensions.  One end of the car had nearly complete platform and draft sills and those were used to make copies.
"B" end of car 5 at Novinger, MO. 
Image courtesty of Adair County
Historical Society.
Other resources played an important role too.  Researcher's visited other Barney and Smith-built cars from the era looking for clues, but most other cars had been retrofitted with more modern accessories from the early 20th Century. The Adair County Historical Society had a wonderful photo of the end platform taken in circa 1903 at Novinger, MO and this proved to be the most valuable guide. 
New platform and draft sills are at-
tached to the car with new fasteners.
Once basic dimensions were established, the rehabilitation team’s next challenge was to find large dimension white oak timbers, the species originally used for the chapel car platform and draft sills, and platform end beam.  Oak is an unusual wood for its density, resistance to decay, its hardness, and for the challenges in drying green wood.  A phenomenon called cell collapse often occurs when forcing large oak timbers to dry and severely reduces strength.  Air drying of green oak timbers is effective but takes years.  So what to do?  Recycled oak beams from an Amish barn in Ohio!
A platform end beam is milled on
the Northfield chain mortiser.
The timbers arrived in mid winter and the team found they had been stored outside.  The timber was cleaned off and any remaining fasteners were removed.  Holes or other minor defects were filled with epoxy or wood plugs were glued in.  Then the process of preparing the timbers began. 
A large slick was used to clean up the
initial cuts made by the mortise machine
There is always a need for good hand
tools when rehabilitating old wood cars!
Four large men were required to guide the 500 pound timbers through the Oliver planer.  During this process, several pockets of insect damage were discovered which had to be treated and repaired.  But in the end, some really great looking timbers were produced for the chapel car. 
Just a sample of the steel hardware that
is unseen inside and beneath the plat-
forms.

Was there more to it? Well, yes.  One of the unsung heros of the project was Ray M.  who repaired or made new the steel tension and tie rods that hold everything together.  Original steel was used wherever possible and was connected to new material with a turnbuckle.  Ray spent many hours custom machining hardware to fit in tight places where it would not be noticed.
There were also new castings required to make it all work.  Fortunately there was at least one copy of everything so the team was able to work with Mackenzie Castings in Arlington, WA to have copies made in ductile iron.  And they did fabulous work too!

The end railing is missing from the car and will have to be fabricated.  Fortunately, the great folks at Prairie Village in South Dakota have allowed the Messenger of Peace researchers to photograph and measure the railings on their chapel car Emmanuel.  These railings appear to be identical to the Messenger of Peace but surprisingly a number of other details including the platform end beam design and layout are not exactly the same even though the cars were built to the same plan.  The railings will be fabricated when additional project funding is secured.
The lead rehabilitation specialist Kevin P.
guides the mounting bolts for the plat-
form end beam into the matching holes.

Platform and draft sills are approximately 16 feet long.  The platform end beam is the width of the car and weighs over 200 pounds.  So a lot of special handling was required to maneuver the timbers around to the other woodworking machines.  And in the end - or at least as of May 2012 -  the Messenger of Peace has regained its platform to preach! 



The completed open vestibule needs one more
detail: an end railing. When more rehabilitation
funding is secured, a replacement railing will be
fabricated