What is next? In the coming weeks water in the boiler will be heated to around 30 degrees C. Then a small hand pump will be used to raise the pressure in the boiler to approximately 200 psi. This process will identify any remaining leaks, or other issues that need to be addressed. When all the remaining leaks are repaired, the hydro-static test will be repeated for the Federal inspector.
Want to see and learn more? Join us for the Snoqualmie Wine Train on Saturday, April 27 beginning at 2:30 PM in the Snoqualmie Depot. Your Wine Train experience will include a visit to the Conservation and Restoration Center to see locomotive 924.