Showing posts with label passenger coaches. Show all posts
Showing posts with label passenger coaches. Show all posts

Monday, March 16, 2020

Work continues on coach 213

Spokane, Portland and Seattle Railway coach 213 was delivered in 1912.  It is one of the last wooden coaches built for service on an American railroad, and was constructed by the Barney and Smith Car Company of Dayton Ohio.  It faithful served in the Northwest until after WW II, a period of more than 35 years.

The 213 is a sister car to coach 218, which was restored by the Museum and its volunteers back in 2014.  The 213 will soon resemble the 218, and this winter the project has made dramatic progress.

Beginning with the roof, the roll roofing was removed from the lower right clerestory to allow repair of the decking and carlines, and application of a new canvas membrane.  Just like the 218, the 213 will be completely roofed with a traditional cotton duck canvas sealed with canvas stain.  Think of it as old-school Gortex!

While the car was in the Conservation and Restoration Center, additional electrical work was performed so it could receive all its new heating elements.  That made it possible to heat the car and begin the interior paneling finish work.  The first project was fabrication and installation of the restrooms.  New wall panels were created using 1/4 sawn Honduras mahogany veneers applied over a Baltic birch plywood.  Similarly, replica restroom doors were fabricated.  The mahogany veneers were treated with 2% potassium dichromate to add color and depth, then the surface was varnished with the Awlgrip single component clear urethane system, which is a moisture cure urethane.

Then work shifted to the interior paneling in the main cabin.  Veneer panels were made to replace the badly deteriorated or missing original panels.  The "tiger stripes" appear as a result of slicing the veneer from a log quarter.  This visual was highly valued then and now, and was a distinguishing feature in this and other cars.

Some other features have been restored to the car, too.  The utility closet located by the door in the rear of the car was recreated.  The interior surfaces are all bead board, and today this enclosure is a practical feature for storing cleaning supplies.  The interior was even painted to match the original!

Many staff and volunteers are making this monumental project possible, as has funding from individuals and 4Culture.  Notably, Bob M. works on the car usually at least four days per week.  He is a cabinet maker who actually likes applying varnish - go Bob, go!  Collectively, there are more than 14,000 hours invested in the restoration, the equivalent of nearly 7 person years!

Staff is continuing to work on coach 213 during the temporary emergency closure.  Coach 213 will return to service just as soon as the Museum reopens to the public.  We hope to see you on board soon!

Thursday, April 19, 2012

From Bad to Beautiful - inspired by you


Last year, The Seattle Foundation orchestrated an incredible one-day online giving event that - thanks to you - raised nearly $19,000 for the Northwest Railway Museum. It was the most successful single day of giving in the Museum’s history.


This year on May 2, from midnight to midnight Pacific Time, GiveBIG is happening again. But it's no same-old, same-old. Inspired by your recent comments on our Facebook page, the Northwest Railway Museum will direct funds raised during GiveBIG 2012 toward seats and upholstery on our interpretive railway.

coach seat with torn seat covercoach seat in good condition

FROM BAD TO BEAUTIFUL

Our last major seating effort was in 1998 when seats in coach 276 were reupholstered at a cost of more than $25,000. Now it’s time to continue the transformation. Will you participate in GiveBIG and help us raise another $25,000, so that older coach seats throughout the train may be restored to their former glory?

Each of the coaches was built about 100 years ago - between 1912 and 1915. When they were new, they were elegant. Today’s “bad to beautiful” effort will reclaim a little of that spirit and make a ride aboard the Snoqualmie Valley Railroad more enjoyable - and more authentic.

HERE’S HOW TO GROW YOUR GIFT ON MAY 2

GiveBIG logoOn Wednesday, May 2, visit The Seattle Foundation’s online Giving Center between midnight and midnight Pacific Time. Make a donation of any size to the Northwest Railway Museum.

The Seattle Foundation and business sponsors will match a share of every donation made during that 24-hour period. BUT . . . the larger our percentage of the total amount of donations made to all nonprofits during that day, the larger our percentage of the matching stretch pool.

If you give just once to the Northwest Railway Museum, please give on May 2.

WANT A REMINDER?
  • If you'd like to receive an email reminder on May 2, please subscribe to our (approximately monthly) e-newsletter. We'll send a brief reminder the morning of May 2.
  • We'll also post The Seattle Foundation's online Giving Center link on our website and on our Facebook page on May 2.
  • RSVP on the GiveBIG 2012: From Bad to Beautiful event page we created. We'll send a brief reminder message via Facebook.
Thank you for participating in this “bad to beautiful” transformation! Thanks, also, to event sponsors, including JP Morgan Chase & Co, Microsoft, Seattle International Foundation, and Seattle Sounders FC. Over the years, The Seattle Foundation has given the Northwest Railway Museum several generous grants in support of general operating expenses and the Railway History Center Train Shed capital campaign. They have our continuing gratitude.