Sunday, May 18, 2014
White glove team
The Northwest Railway Museum was honored to host a Reinforcement Crew event on May 17. The Reinforcement Crew is a team of museum collections professionals from the Registrars Committee of the American Alliance of Museums ("AAM"). The AAM is holding their conference in Seattle this month and registrars from all over North American are visiting for this largest annual gathering of museum professionals in the world.
The Reinforcement Crew supports collections projects at small museums located in the annual conference host city. This 7th annual event selected five projects to support, including one here at the Northwest Railway Museum. The Museum's project inventoried and boxed the collection of published material, which has been housed in the Snoqualmie Depot since the early 1980s. This paper-based collection is being packed up and stored in preparation for its eventual relocation to the new Railway History Center library expected to open next year in Snoqualmie. The new library will store materials in a temperature and humidity-controlled vault to help assure long term preservation.
Volunteers participating in the Northwest Railway Museum's project included Rebecca Engelhardt, Museum of Glass; Jessica Wilks, Tacoma Art Museum; Elizabeth K Mauro, Art Installation; Mell Scalzi, Museum of Arts and Design; Ariane Westin-McCaw, Nordic Heritage Museum; and Jeri Miller, Artech. Participating from the Northwest Railway Museum were Cristy Lake, Peggy Barchi, Dennis Snook, George Houle and Spike. Thank you to all who participating!
During a seven hour work party, more than 120 boxes were filled with books and a detailed inventory of each box was generated and recorded. Boxes were loaded into the Museum's coach 218, which has been undergoing rehabilitation and restoration in the Conservation and Restoration Center. The 218 is nearly complete with a few weeks work on ceilings, some moldings and seats remaining to be completed. So it was a natural choice for transporting the library collection as it was not yet being used on the regular train, and it gave Museum staff an opportunity to evaluate the car's performance. It also gave the visiting collections volunteers an opportunity to travel in rehabilitated coach more than 100 years old!
Monday, April 28, 2014
Give BIG to steam!
Steam at Snoqualmie Railroad Days! That's the plan for this coming August 15 - 17 when the Santa Cruz and Portland Cement locomotive 2 will travel to Snoqualmie to operate under steam during the annual town festival. Celebrating 125 years of excursion train service to Snoqualmie Falls, the 1909-built Porter locomotive will add considerable excitement to the working railway in the upper Snoqualmie Valley. Your contributions during GiveBIG on Tuesday, May 6 will help make this plan a reality, but they must be made through the Museum's page on The Seattle Foundation's web site here. Contributions up to $5,000 will be partially matched from The Seattle Foundation's stretch pool too, and may even qualify for a bonus contribution called a Golden Ticket!GiveBIG is the annual charitable giving event organized and supported by The Seattle Foundation. Each of more than 1,600 charities including the Northwest Railway Museum are eligible to receive contributions and their pro rata share of the stretch pool received between midnight and midnight on Tuesday, May 6, 2014.
Help bring a real, live steam locomotive to Snoqualmie Railroad Days by participating in GiveBIG on May 6!
![]() |
With your GiveBIG support, Santa Cruz and Portland Cement #2 is coming to
Snoqualmie August 15 - 17. Photo courtesy of S. Pappas.
|
Thursday, April 24, 2014
Celebrating 125 years of passenger trains
2014 is a big year for the Snoqualmie
Valley! This summer is the 125th
anniversary of passenger train service to the valley. On July 4, 1889 the inaugural run was a day
trip from the foot of Western Avenue in Seattle to Snoqualmie Falls. The excursion was operated by the ME Church Society over the lines of the Seattle, Lake Shore and Eastern Railway Company.
125 years later, the Northwest Railway Museum
continues the tradition of train excursions to Snoqualmie Falls. To kick off the celebration, the
Museum will operate a commemorative train on July 4. Then we have something
even bigger planned to celebrate. We’re
letting off a little steam (not blowing smoke!) by bringing a real, live steam
locomotive to operate at the Museum during Snoqualmie Railroad Days, August 15 –
17.
![]() |
| Santa Cruz and Portland Cement #2, built by H. K. Porter in 1909. Photo courtesy of S. Pappas. |
The Santa Cruz and Portland Cement locomotive #2 will travel to Snoqualmie on a highway truck. Owner Efstathios I. Pappas will be bringing the locomotive to Snoqualmie from another museum event in California. It will pull the Northwest Railway Museum's passenger train Friday through Sunday - watch for special train schedules that will be announced this summer.
The visit of this Porter-built steam locomotive will celebrate the continuing passenger train excursion service to Snoqualmie Falls, but it will also help the Northwest Railway Museum prepare for a steam program of its own. The experience will "plant the seed" for a long-term, sustainable program. Cost, however, will not be for the faint-of-heart. Transportation of the locomotive, fuel oil and lubricants, and even water will cost thousands of dollars.
Your support can make this a reality! Make your contribution through GiveBIG, the annual charitable giving initiative of The Seattle Foundation and you can "stretch" at least some of your donation. All contributions up to $5,000 made on May 6 will be partially matched by The Seattle Foundation. So plan to visit the Museum's Seattle Foundation donation page on May 6, 2014 and help make this project a reality!
Your support can make this a reality! Make your contribution through GiveBIG, the annual charitable giving initiative of The Seattle Foundation and you can "stretch" at least some of your donation. All contributions up to $5,000 made on May 6 will be partially matched by The Seattle Foundation. So plan to visit the Museum's Seattle Foundation donation page on May 6, 2014 and help make this project a reality!
![]() |
Santa Cruz and Portland Cement #2 pauses under steam. Photo courtesy
of S. Pappas.
|
Friday, April 18, 2014
Crossing gate retired
The Museum recently retired a railroad crossing gate mechanism that was placed in service in 1953, reportedly on either the Great Northern or Northern Pacific Railway here in Washington State. It was received in a donation from the Burlington Northern in 1977 and installed on Meadowbrook Way SE in Snoqualmie.
The Griswold-built device was manufactured in Minneapolis by the precursor to today's Siemens Rail Automation. This device is known in the industry simply as a model EM gate, and was replaced with a much newer device of the same design that was rebuilt by the Museum's signal maintainer Jon B. Rebuilding included new wire, a new relay, repainting, new lights, new cross bucks and more. Total financial investment was modest but an estimated 175 person hours were invested in the project.
The original device served the Museum well but the mechanism was badly worn; replacement was the only practicable option. The newly rebuilt device will easily serve for twenty or more years thanks to the efforts of Jon and others at the Museum.
Come and see it in operation for yourself - trains operate weekends through the end of October. Check out schedules and fares on the Museum's web site at www.trainmuseum.org
Monday, April 14, 2014
Coach 218 interior paneling
Wall paneling is cut and fit inside
coach 218. Veneers have at least nine
coats of shellac.
|
New and recovered mahogany veneers have been pressed onto new plywood cores using the Museum's vacuum veneer press. Some veneers were removed from original but damaged solid core plywood. Replacement veneers were acquired from Edensaw, a specialty hardwood supplier. The flitches were carefully laid out and trimmed to match along each edge. Special veneer tape was used to maintain indexing while glue and pressure was applied.
There are 43 windows in coach 218 so
there are a number of window panels.
|
After curing the adhesive, the veneer was colored using a 2% solution of potassium dichromate, an old but effective technique for darkening the wood and drawing out the figure. Following a drying period, "varnish" was applied, which consists of nine or more coats of shellac.
Shellac is a natural finish made by dissolving buttons of shellac in alcohol, and is available with semi-transparent color that ranges from clear to black. (The buttons are made by melting the secretions of the lac bug collected from trees in India and Indonesia.) It is the traditional interior finish used by the Barney and Smith Car Company on coach 218, but also chapel car 5 Messenger of Peace.
Coach 218 is using a shellac variety called "ruby." which not coincidentally possesses a reddish hue. However there can be considerable variation in the appearance of wood so the coach 218 crew has used other varieties of shellac when panels are too light or too dark.
There are many hours of effort remaining to fit all the panels but this stage represents an important and long-awaited milestone.
Friday, April 4, 2014
More bridge repairs
Old pony bent, caps and roller nest on
the east pier of bridge 35.
|
Performing comparatively minor bridge work is expensive for many of the reasons noted in the last blog post, but also for the cost of mobilizing the specialized equipment to perform the work. Any opportunity to combine two or more tasks into one project generally yields substantial cost savings. So the scope of work was set: change timber caps and girders, replace bearing pads, and replace pony bent. For bridge 35, this should have been four days work but unfortunately not everything goes according to plan.
Work began on a typical spring day in the Northwest: wet and cool. Initially, the bridge lifted without incident and the old roller nests were removed. Timber replacement began and then something started to go wrong: a weld in the steel added to support the jacking arrangement failed and two steel angles near the jacking area began to fail. The bridge slowly descended approximately 6 inches onto the pier. Fortunately no one was hurt and there was no serious damage. However this was another timely reminder about how challenging it can be working with a structure designed and built more than 125 years ago. And because it is "safety first," this minor damage will be repaired before any passenger trains operate over the bridge, even though this will affect the first trains of the year.
Imhoff's 65 ton crane lifts the end of
bridge 35.
|
New copper-treated timbers are in
place and now workers are installing
the new base, soul plate, and bearing
pad on the south side of the east pier.
|
New soul plate is inserted
on top of the new
Fabreeka pad under bridge
35 in North Bend.
|
With all the work except installation of the new pony bent complete, repair of the damaged steel angles is now the focus. New angle irons are being drilled to match the existing holes. They will be incorporated into the bridge as soon as their fabrication is complete. After these minor repairs are completed and the bridge is "double checked," train service to North Bend will resume.
Labels:
Bridge 35,
bridges,
collection care,
Northern Pacific Railway
Saturday, March 29, 2014
Bridge repairs
So you think you can repair a bridge? Well great, you start tomorrow! Now if only it were that simple . . .
Most bridges are near water and at a minimum require a hydraulic permit before work can begin, and this usually adds conditions to a project. Railway bridge work - by law - must be supervised by someone experienced in the maintenance and repair of railway bridges. And any modifications must be reviewed by a qualified railway bridge engineer. So even the damage caused by a tree striking a bridge triggers a variety of additional requirements besides just ordering new timber.
A tree striking a bridge? Yes, that was the subject of a recent blog post. A very large tree struck and damaged formerly Northern Pacific's Bridge 35's trestle during a recent windstorm. Bridge inspectors allowed several trains to pass but stipulated that permanent repairs had to be undertaken right away. And as one of the largest objects in the Museum collection, how those repairs are performed is also critically important for collection care standards. So the Museum committed to completion prior to the start of the 2014 operating season using an experienced contractor and licensed engineer.
Step one: given the urgency of the bridge repair, the Northwest Railway Museum was able to secure an emergency hydraulic permit. Step two: pressure-treated railway bridge timbers were located in South Dakota (ironically, made from Douglas fir cut near Tacoma) and were ordered. Step three: a qualified contractor, foreman and engineer were identified and hired. Step four: real work begins!
To help control costs, some of the site preparation was performed by community work crews. They removed bolts and shovel railway ballast off the deck. In addition, Museum volunteers cleaned, chased threads, and primed the bolts to allow reuse. And the Museum agreed to supply the materials to avoid handling charges from the Contractor.
Late in March 2014 Pivetta Brothers Construction began work on the bridge under the supervision of Muth Consulting Engineers. Best practices including a silt fence were established to prevent any silt, dirt, rock or pieces of wood from getting in the river. Concrete ecology blocks and timber jacking pads were situated under the damaged section. Damaged deck and curb timbers were removed along the the stringers. Bracing and bolts were removed from the pile cap. Then blocking was used to support a wide flange beam that in turn was used to support the bridge deck. This allowed the damaged pile cap (the end was lightly crushed when the tree hit) to be removed and replaced.
Two stringer sections each 28 feet long, 9 inches wide and 18 inches deep were damaged by the tree strike. These were replaced with two new Douglas fir stingers of similar (slightly wider) dimension that were pressure treated with copper naphthenate preservative. The timbers had to be drilled for indexing pins, and for bolts to tie the stringers to the deck and ballast curb.
Total working time for the trestle repair was five days and was completed before the end of March; costs exceeded $25,000. Ideally, this would have been the extent of bridge work for 2014. However that was not to be and will be the subject of an upcoming blog post.
| Damaged sections are obvious but the method for replacement is not. |
A tree striking a bridge? Yes, that was the subject of a recent blog post. A very large tree struck and damaged formerly Northern Pacific's Bridge 35's trestle during a recent windstorm. Bridge inspectors allowed several trains to pass but stipulated that permanent repairs had to be undertaken right away. And as one of the largest objects in the Museum collection, how those repairs are performed is also critically important for collection care standards. So the Museum committed to completion prior to the start of the 2014 operating season using an experienced contractor and licensed engineer.
| First of the timbers required to repair Bridge 35 arrived and were moved to the site using the Speedswing. |
| Stringers under the timber deck are exposed during the pile cap replace- ment. |
| Bridge deck is supported with blocking and a wide flange beam. |
| Two new stringers were installed above the new pile cap. |
Total working time for the trestle repair was five days and was completed before the end of March; costs exceeded $25,000. Ideally, this would have been the extent of bridge work for 2014. However that was not to be and will be the subject of an upcoming blog post.
| Damaged section is repaired! New ties have been installed and the track is about to receive new ballast. The new and existing ballast curb is shown on either side of the deck. |
Labels:
Bridge 35,
bridges,
collection care,
Northern Pacific Railway
Subscribe to:
Posts (Atom)


