Wednesday, December 23, 2009

Steel erection begins!

The Train Shed is now beginning to take shape. On Tuesday, December 22, 2009 subcontractor CHG Building Systems began erecting steel columns for the Train Shed. CHG is not a newcomer to the Museum – they were also involved in construction of the Museum’s Conservation and Restoration Center in 2005 and performed work on that project to a high standard. For this repeat performance, CHG is using a crane, telescoping lifts and of course a highly skilled team of erectors, and the building is beginning to take shape.

The Train Shed will be a fully enclosed and semi conditioned exhibit building for the Northwest Railway Museum’s collection of railway transportation artifacts including locomotives, coaches and freight cars. Priority exhibits will include the most vulnerable objects – typically the oldest and those built predominantly of wood – and will include the 1898-built Chapel Car 5 Messenger of Peace, White River Lumber Co caboose 001, and Northern Pacific Railway steam locomotive 924.

Construction began in July 2009 and substantial completion of the steel structure is anticipated in March 2010. Track construction will begin after the building is completed; project will be dedicated in August 2010. This nearly $4 million project has been in development for five years.

Major funders include the Washington State Historical Society’s Capital Projects for Washington’s Heritage, McEachern Charitable Trust, 4Culture, The Seattle Foundation, TEA-21 Transportation Enhancements, Puget Sound Energy Foundation, Nysether Family Foundation, Osberg Family Foundation, Washington Department of Commerce, Schwab Fund for Charitable Giving, and hundreds of individuals. Additional support is requested and can be made through the Museum’s web site here or on the American Express Giving Express site here.

Tuesday, December 1, 2009

Train Shed steel

The Train Shed construction is continuing to proceed but some of the most impressive work takes place in a manufacturing facility. Take the steel columns and girders as an example, part of the Varco-Pruden brand building designed for the Museum. They are being fabricated at Wick Constructor's subconcontractor BlueScope Buildings NA, Arlington, Washington facility, about 90 minutes north of the Museum.

Ironically, the BlueScope Buildings NA facility is located adjacent to the BNSF Railway and a section of former Seattle, Lake Shore and Eastern Railway that is just about the same physical distance the Train Shed is being built from the Museum's section of former Seattle, Lake Shore and Eastern Railway. And for the record, mill steel is still delivered to the BlueScope facility by rail however the Train Shed is being built with components fabricated from American-made sheet and roll steel delivered by truck.

A recent tour of the BlueScope facility conducted by mill manager Phil S. revealed a plant dedicated to quality and safety. Much of the welding is performed by automated machines however due to the custom design of many buildings there were a number of welders manually completing the fabrications by hand. The actual Train Shed components were on the floor in fabrication and it was really interesting to see the transformational process from basic steel plate to finished column or girder. At the end of the production line, the components were physically dipped into primer to ensure full coverage of all surfaces.

The Train Shed fabrications are nearly complete and structural steel is scheduled for shipping to the Northwest Railway Museum on Friday, 4 December 2009. Train Shed erection will begin on Monday, 7 December 2009; assembly will take approximately three months.

Additional images are available for viewing on the Museum's WASteam web site.

Thursday, July 23, 2009

Train Shed construction begins!

It did not begin with any ceremony, pomp, or circumstance. Instead, it began with a chain saw. The technological marvel called the railroad made the Northwest's forest industry viable by providing economical transportation of raw logs to the mill and processed lumber to market. So it seems appropriate that a small, carefully planned logging operation would be required to build the Train Shed. And nothing was wasted. Good logs went for lumber, less desirable logs went for pulp, and everything else organic including the branches were ground up and sent to Simpson Timber's plant to make steam.

Logging today is very different than just a generation ago. Excavators are used to control the tree falling. Access to the site is tightly controlled so there is no danger of anyone wandering into the work zone. Logs are sorted and piled with an excavator. And in implementing the Museum's really aggressive tree retention plan, trees can be removed from a grove with almost surgical precision. It's truly a remarkable experience to watch the process.

So about two weeks of effort later, the building corners are set - the pink ribbon in the photo is the actual location of the building corner. This is the south east corner of the building and in a few months this view to the north will incorporate 25,000 square feet of indoor exhibit space. An ambitious effort for any history museum, this project is unique in the Pacific Northwest. Progress will be updated on this blog and on the Museum's web site at http://www.trainmuseum.org/



Thursday, June 11, 2009

Train Shed contract let

Two years of design and permitting, nearly four years of fundraising, and many hours of negotiation have culminated in a contract for construction of the new Train Shed. The Train Shed will be an indoor exhibit building for large artifacts including locomotives, coaches and freight cars and will incorporate 25,000 square feet. Construction will be predominantly steel with a concrete stem wall. The design is earthquake resistant to magnitude 7.4, and flood proof to a level approximately 2 feet above the 100 year flood plane.

The Train Shed will provide fundamental preservation for critically endangered artifacts including Chapel Car 5 Messenger of Peace, White River Lumber Caboose 001, and Northern Pacific steam locomotive 924. It will also provide an attractive and comfortable environment for museum visitors. This classroom will be used to preserve, teach and perpetuate Northwest railroad history.

The bidding process was complex. With a large grant from the Federal government, special contracting provisions were required including administration of the project by King County Road Services. A call for proposals was issued in February and bids closed in late March. A period of analysis occured and an apparent low bidder was identified. Additional analysis delayed an offical decision until late May and a contract was signed in early June. The successful bidder is Wick Constructors of Bellevue, a firm with a variety of successful commercial building experiences. They are expected to complete the building in the first quarter of 2010.

The next step is a notice to proceed. This will be issued after all the required submittals including insurance and additional contracting documents are received by the County.